Sai Life Sciences and AstraZeneca have published a study titled “ReactIR Monitoring of Turbo-Hauser Base Formation Enables a Robust Iodination […]
PB14: Adding Scale and Flexibility to Our Manufacturing Infrastructure
20 Nov 2026
Our new multipurpose manufacturing facility, PB-14 in Bidar is slated to commence commercial production this month. The facility will house 42 reactors, with a total installed reactor capacity of 210 KL, adding manufacturing capacity to support a range of process requirements.
Designed to accommodate diverse manufacturing needs, PB14 will be equipped with automation and process control systems to support process consistency and operational efficiency. Its addition will expand our manufacturing capacity and provide greater flexibility in supporting customer programs across different stages and process requirements.
With PB14, we continue to invest in expanding our manufacturing infrastructure in line with evolving customer needs. The facility is expected to be inaugurated over the next two months.
Our existing manufacturing infrastructure at Bidar has approximately 700 KL of installed capacity across multiple manufacturing blocks and 80 production trains, with reactor sizes ranging from 0.25 KL to 12 KL. The site includes dedicated blocks for sensitive reactions and HPAPI manufacturing, including a dedicated HPAPI block with containment levels below 0.1 µg/m³.
Other capabilities include high-pressure and moisture-sensitive reactions, column chromatography, cryogenic reactions, and lyophilization at pilot and commercial scales. The infrastructure is supported by 11 ISO Class 8 cleanrooms and containment capabilities of 1 µg/m³.
Related News
As drug discovery programs increasingly demand faster optimization cycles and access to broader chemical space, advanced chemistry approaches are moving […]
20 May 2026
EBITDA up by 56%YoY; Net Profit up by 109%YoY Hyderabad, May 14, 2026: Sai Life Sciences Limited (BSE: 544306 I NSE: […]